New Construction Assembly Instructions; Before Installation - Utilitech 7113-01-L Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NEW CONSTRUCTION ASSEMBLY INSTRUCTIONS

NEW CONSTRUCTION – ATTACHING TO THE
JOIST

BEFORE INSTALLATION

Turn off power source. Review all safety precautions.
1. Insert the suspension bracket into the fan body.
(If spacing between joists is 21-1/4 in. to 23-1/2 in.
(540 to 597 mm), connect suspension bracket
I and II).
2. Mount the fan body to joist using the suspension
brackets and long wood screws.
Hardware Used
AA
Long wood screw
3. CAUTION: Dimension "B" should allow for
thickness of ceiling board used in your appli-
caton. Do not flush mount to joist. Flange
should be flush with ceiling board.
4. Refer to wiring diagram on page 5. Remove the
junction box cover. Using quick connectors,
connect house wires to ventilating fan wires:
black to black; white to white; green to green.
Replace the junction box cover.
CAUTION: If your house wires do not match
these colors, you must determine what each
house wire represents before connecting and
you may need to consult an electrical contractor
to determine this safely. Mount junction box
cover carefully so lead wires are not pinched.
1
2
x 2
3
4
6
AA
Wiring
box
Quick
connector
House
wires
Product
wires
Lowes.com

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido