Hach MP-6 Instrucciones Para El Usuario página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
Close the meter case
1.
Align the cables so that they are not pinched and do not obstruct the IR transmitter when the bottom case is
installed (Figure 1 on page 4).
2.
Make sure the sealing gasket is installed in the groove of the top case.
3.
Attach the bottom case and tighten the four screws evenly and securely. A waterproof seal cannot be
guaranteed unless the screws are tightened by hand and secure. Do not overtighten the screws.
4.
Fill the pH/ORP sensor cup with pH storage solution and replace the protective cap.
Note: Always calibrate the meter after maintenance procedures.
1 Sensor opening
2 Alignment guide
3 pH/ORP sensor body
4 IR transmitter—do not
obstruct
4
Figure 1 Internal view of the meter
5 Black cable
6 Cable connector (2x)
7 ORP connector
8 pH connector
9
Red cable
10 Circuit board
11 Lock tab

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mp-6p

Tabla de contenido