Maintenance and Service
Equipment Maintenance and Service
Meter Inspection
Do not use if meter appears damaged. Visually inspect the meter to ensure case and
jaws are not cracked.
Test Lead Inspection
Inspect and replace test leads if insulation is damaged, metal is exposed, or probes
are cracked. Pay particular attention to the insulation surrounding the connectors.
Battery Inspection/Replacement
This unit uses no batteries.
Maintenance and Storage
Switch off and disconnect the meter completely before carrying out any
maintenance. Clean the case with a damp cloth and mild detergent. Do not use
abrasives or solvents. Keep away from liquids and ensure the meter is completely
dry before use.
Service and Replacement Parts
This unit has no user-serviceable parts.
Probe Storage
15