ABB UP 180 Comfort Instrucciones De Montaje página 33

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77
Settings on the Unit
Manual Adjustment of Cutout Delay and Switching
Brightness
The cutout delay (rundown time) and switching
brightness (ambient brightness) can be set manually
or via the parameterization function (using ETS2 or
Power-Project 3.x).
On the back of the UP watchdog there are two
setscrews (rotary potentiometers, can be deactivated
via parameterization).
Left setscrew adjusting switching brightness
switching irrespective of brightness level
switching only when dark
Right-hand setscrew adjusting the cutout delay in
minutes or seconds.
GB
>>>

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido