Statement Of Conformity - baltur BTL 0 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

GB - Before using the burner for the first time please carefully read the chapter "WARNINGS NOTES FOR THE USER : HOW
TO USE THE BURNER SAFELY" in this instruction manual, which is an integral and essential part of the product. The
works on the burner and on the esystem have to be carried out only by competent people.
- Read carefully the instructions before starting the burner and service it.
- The system electric feeding must be disconnected before starting working on it.
- If the works are not carried out correctly it is possible to cause dangerous accidents.
We hereby declare under our own responsibility, that our "CE" marked products Series:
Sparkgas...; BTG...; BGN...; TBG...;
Minicomist...; Comist...; RiNOx..., BT...;
BTL...; TBL...; GI...; GI...Mist; PYR...; TS...
Description:
domestic and industrial blown air burners fired by gas, oil and dual fuel respect the minimal regulation of the
European Directives:
• 90/396/EEC (G.A.D)
• 92/42/EEC (B.E.D)
• 89/336/EEC (E.M.C. Directive)
• 73/23/EEC (Low Voltage Directive)
• 98/37 EEC (Machinery Directive)
and have been designed and tested in accordance with the European Standards:
• EN 676 (gas and dual fuel, gas side)
• EN 267 (light oil and dual fuel, oil side)
- EN 60335-1:2001:A1:2004+A11:2004 +A2:2006
- EN 60335-2-102:2006
- EN 50165:1997:A1:2001
- EN 55014-1:2000 + A1:2001+A2:2002
- EN 55014-2:1997 + A1:2001
- EN 50366:2004 + A1:2006
- EN 61000-3-2:2000 + A2:2005
Surveillance accordingly Gas Appliances Directive 90/396/EEC made by:
ENGLISH
-
Warning notes ..................................................................................................................................................................... "
-
Technical specifications ...................................................................................................................................................... "
-
Hydraulic connections ......................................................................................................................................................... "
-
Fitting to the boiler .............................................................................................................................................................. "
-
Appliance specifications - Preparations for start up - Starting up and regulation
Electrodes adjustment - Air regulation - combustion adjustment ...................................................................................... "
-
Maintenance ....................................................................................................................................................................... "
-
Operation problems ............................................................................................................................................................ "
-
Pump particuler ................................................................................................................................................................. "
-
Electrical connections – Wiring diagram ........................................................................................................................... "

Statement of Conformity

CE0085 - DVGW
7 / 64
0006080748_20072
Vicepresidente e Amministratore Delegato:
The Vice President and Managing Director:
Administrador Delegado:
Dr. Riccardo Fava
E
N
G
L
I
S
H
PAGE
18
20
23
24
25
28
29
30
31

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Btl 0hBtl 6Btl 6hBtl 4Btl 4hBtl 10 ... Mostrar todo

Tabla de contenido