Kohler K-400 Guia De Instalacion página 10

Ocultar thumbs Ver también para K-400:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hot Water
Supply Line
Hot Water
Supply Line
4. Complete the Valve Installation
WARNING: Risk of personal injury. Do not turn the
thermostatic mixing valve stem after you adjust the temperature
setting until you install the mixing handle trim. This device has
been calibrated at the factory to ensure a safe, maximum water
temperature. Any variance may raise the discharge temperature
above the safe limit and present a scalding hazard.
For K-400 and K-402 valves: Turn on the water supply lines to
the valves and check for leaks. Run water through the mixing
valve, all showers and the spout. Check the system for leakage.
Turn off the water.
For K-401 and K-404 valves: Remove the plaster guard. Do not
turn the thermostatic mixing valve stem until you have installed
the valve trim. Turn on the water supply lines to the valves and
check for leaks. Run water through the mixing valve, all showers
and the spout. Check the system for leakage. Use the volume
control/shut-off valve (top control) to control the water flow to
the shower outlet. Turn off the water. Reinstall the plaster guard
Complete the finished wall.
116716-2-AC
Volume
Control/Shut-off
Valve
Cold Water
Supply Line
Mixing
Valve Stem
Cold Water
Supply Line
10
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-401K-402

Tabla de contenido