Fanimation SLINGER v2 Manual Del Usuario página 8

Ocultar thumbs Ver también para SLINGER v2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan (continued)
6. Reinstall the hanger ball on the downrod as
follows. Route the black/white, blue, red, gray, yellow
wires and through the hanger ball. Position the pin
through the two holes in the downrod and align the
hanger ball so the pin is captured in the groove in the
top of the hanger ball. Pull the hanger ball up tight
against the pin. Securely tighten the set screw in the
hanger ball. A loose set screw could create fan
wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
NOTE: All set screws must be checked, and retightened
where necessary, before installation.
8. Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
8
Figure 6
Figure 7
Figure 8

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Lp8147slbl0795392

Tabla de contenido