Complete The Installation - Kohler K-9486 Manual Del Usuario

Ocultar thumbs Ver también para K-9486:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Install the Finished Wall Material
IMPORTANT! If the shower receptor is adjacent to vertical ducts or chases, the shower receptor must be
surrounded with fire-rated, water-resistant wall material.
Install the wallboard with the factory edge (the paperbound edge) a minimum of 5/8" (15 mm)
above the finished, nailing-in flange threshold of the shower receptor.
Apply silicone sealant to the upper portion of the nailing-in flange where it will meet the
water-resistant wall material.
Ensure the front nailing-in flanges are similarly furred, and the wallboard is sealed to the nailing-in
flange.
Mud, tape, and finish the wallboard.
Seal the joints between the receptor rim and the finished wall with silicone sealant. RTV (Room
Temperature Vulcanizing) sealant is recommended.

6. Complete the Installation

NOTE: Refer to the sealant and/or putty manufacturer's instructions for proper application techniques.
Seal around the valving and outlets with silicone sealant or plumbers putty.
Install the shower trim and drain trim according to the manufacturer's instructions.
Install the shower door according to the manufacturer's instructions.
Install the finished floor.
Apply silicone sealant along the front edge of the receptor where it meets the floor.
Kohler Co.
Finished Wall
Check walls
for plumb.
Paperboard
Edge Down
Nailing-In Flange
Threshold
9
Wallboard
Furring Strip
5/8"
2x4
(1.6 cm)
Framing
Min
Galvanized
Nail
Silicone Sealant
1058614-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-9488K-9489K-9496

Tabla de contenido