Plaster
Guard
2-7/16"
Min
(6.2 cm)
Finished
Wall
3-3/4" (9.5 cm)
1. Prepare the Site
Provide a 2-7/8" (7.3 cm) to 3-1/8" (7.9 cm) diameter hole in the
wall material for the plaster guard.
2. Route and Connect the Water Supply
Route the 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the transfer valve inlet.
Kohler Co.
Max
Finished
Wall
Mixed Water
Supply 3/4"
Copper Tubing
or Piping
3
1173682-2-A