Prepare The Site - Kohler K-737 Guia De Instalacion

Ocultar thumbs Ver también para K-737:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Plaster
Guard
2-7/16"
Min
(6.2 cm)
Finished
Wall
3-3/4" (9.5 cm)

1. Prepare the Site

Provide a 2-7/8" (7.3 cm) to 3-1/8" (7.9 cm) diameter hole in the
wall material for the plaster guard.
2. Route and Connect the Water Supply
Route the 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the transfer valve inlet.
Kohler Co.
Max
Finished
Wall
Mixed Water
Supply 3/4"
Copper Tubing
or Piping
3
1173682-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido