Hunter Spa Select 90050 Manual De Instrucciones página 5

Ocultar thumbs Ver también para Spa Select 90050:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

A7
A9
Insert the strain relief into the housing and secure
A11
Screw pre-loaded screws into joist or framing.
41717-01 05/31/2006
41717-EngS_05.31.06.indd 5
F
Remove the wiring cover.
C
with the washer.
A8
Pop out the first wiring access slug. Use second if needed.
A10
5/8
1/2
B
Position the correct depth mark at the bottom edge
of the joist–based on the thickness of your sheet rock.
Nail the tabs on both sides to joist or framing so that the
housing will be flush with the finished ceiling.
D
OPTION
Nails are not provided.
D
5/8
1/2
5
5/31/06 3:53:18 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Spa select 90051Spa select 90059

Tabla de contenido