Descargar Imprimir esta página

Dell PowerEdge 2800 Actualización De Información página 12

Ocultar thumbs Ver también para PowerEdge 2800:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
Installing the Cable-Management Arm
Although the cable-management arm can be installed on either side of the system rack, it is
recommended that you install it on the right side (when facing the back of the system). Installing
the cable-management arm on the left side of the rack will require you to disengage the cable-
management arm to access the power supplies for removal or replacement.
10
Information Update

Publicidad

loading