Kohler K-702010 Guia De Instalacion página 12

Ocultar thumbs Ver también para K-702010:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10. Finish the Installation
Perform any final adjustments to the glass panel (refer to the "Adjust the Operating Glass Panel"
section of this document).
Apply Sealant
IMPORTANT! Carefully follow the silicone sealant manufacturer's instructions for application and curing
time.
NOTE: This step is critical to the long term performance of your shower door.
Using silicone sealant (only), apply a bead of sealant to the outside (dry side) where wall jamb and
strike jamb meet the wall and to the outside (dry side) where the bottom threshold meets the
shower ledge.
Use masking tape to protect areas adjacent to those where the sealant is being applied.
Attach the Accessories
Insert the accessories into the top of the wall jamb on both the interior and exterior of the shower.
Choose any two combinations of the razor hook, cap, or robe hook.
1011451-2-F
Apply silicone sealant to outside of
the jambs and bottom threshold.
Cap
Razor
Hook
Attach accessories.
12
Robe
Hook
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-702011K-702012K-702013

Tabla de contenido