Descargar Imprimir esta página

nVent RAYCHEM E-100-A Instrucciones De Instalación página 4

Ocultar thumbs Ver también para E-100-A:

Publicidad

Idiomas disponibles

Idiomas disponibles

5
• Pull heating cable back through bottom of end seal stand
until braid is just visible above strain relief. Use cable
lubricant if needed.
7
• Install cap; tighten until the slot on the cap and the slot on
the stand align.
8
• Fasten end seal to pipe with strap. Do not
pinch heating cable.
• Install cable tie.
• Loop and tape extra heating cable to pipe.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Fasten end seal label to insulation.
• Leave these installation
instructions with the user for
future reference.
4 | nVent.com
Braid
Strain
relief
Pipe strap
6
CAUTION: Health
Hazard. Wash
hands after contact
with sealant.
Consult material
safety data sheet
VEN 0058.
• Push boot onto
the end of the
heating cable until it
bottoms out.
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) between
stand and pipe.
Trim
JBS-SPA
adapter for
small pipes
Cable tie
Glass cloth tape
Position
adapter
this side
up.

Publicidad

loading