Kohler STERLING 6300 Serie Guia De Instalacion página 8

Ocultar thumbs Ver también para STERLING 6300 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Wall
Jamb
Receptor
"A"
4. Seal and Install the Bottom Track
Thoroughly clean and dry all dust, dirt, and grease from the bottom track and shower ledge
surfaces where the bottom track will sit and the silicone sealant will be applied.
Measure from the left side stop in the wall jamb to the right side stop (dimension A).
Using a pencil, mark dimension A on all three sides of the bottom track.
Along the inside edge of the pencil marks, place a piece of masking tape.
Carefully cut the bottom track along the masking tape edge.
Use a file to remove the rough edges along the cut.
Remove the masking tape.
NOTE: When positioning the bottom track in the wall jambs, move the inside edge of the bottom track
against the small stop first. Then gently push the entire bottom track down until the outside edge is in
position against the wall jamb and the threshold .
Insert the bottom track between the two wall jambs to check for proper fit. The outside of the
bottom track (high side) should face toward the outside of the shower. The inside end of the bottom
track should fit snugly against the back edge of the wall jamb (Inside of Shower)
Remove the bottom track from the wall jambs.
Apply silicone sealant in the groove located on the underside of the bottom track.
Reinstall the bottom track.
Secure the bottom track in place with masking tape.
1019156-2-H
Bottom Track
Stop
Outside/Front of
Bottom Track
Bottom Track
Wall
Top View
Jamb
"A"
8
Apply
sealant here.
Inside/Back of
Bottom Track
Bottom
Track
Stop
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido