Descargar Imprimir esta página

Fluidmaster PerforMAX 402CARHR Guía De Instalación Rápida página 4

Ocultar thumbs Ver también para PerforMAX 402CARHR:

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 4: INSTALL NEW FLAPPER
A:
REMOVE CARDBOARD FROM
UNDERNEATH FLAPPER
B:
INSTALL NEW FLAPPER
Place flapper on top of flush valve seat and snap
arms onto flush valve mounting posts.
C:
ATTACH FLAPPER CHAIN TO LEVER
Pinch clasp of clip and attach the clip to the tank
lever directly above the flapper. Leave roughly ½"
inch of slack in chain. (small "j" shape)
To adjust chain length, remove clip and reposition
lower on the chain for shorter length.
Note: We will adjust the flapper in Step 9 after
setting the proper water level in the tank and bowl.
TIP: A quick and easy way to adjust the chain length.
Take the clip off the chain, dangle it through the small part of the clip (A),
then pull both sides of the chain downward until it snaps into place (B).
A
6
Down
1/2"
Slack
(SMALL "J" SHAPE)
B
STEP 5:
ADJUST HEIGHT OF NEW FILL VALVE
A: TWIST FILL VALVE TO ADJUST HEIGHT
Top of fill valve cap should measure roughly 3"
above top of overflow pipe when installed.
NOTE:
Increasing height allows
more water to fill in the tank.
Press
*Lever Hole
*
If the top of your overflow pipe is not at least 1" below the bottom of the tank lever hole,
adjust it. If the overflow pipe is not adjustable, mark the overflow pipe 1" below the bottom
of tank lever hole and using a hacksaw, cut the overflow pipe at the specified mark.
HOLD
Do not lift lock ring out of
locked position.
TWIST
LEFT
Fill Valve Cap
TOP OF FILL VALVE CAP
TOP OF OVERFLOW PIPE
Overflow Pipe
3"
7

Publicidad

loading

Productos relacionados para Fluidmaster PerforMAX 402CARHR