8. Reinstall fasteners - loosely reinstall the existing (6) M10 hex
flange nuts onto the studs, (3) per side.
Reinstall exhaust hanger - reattach the exhaust hanger over the
9.
hooks on end panel and install the (2) M8 bolts.
12. Reinstall the underbody panel if removed in step 6.
13. Reinstall fascia - Be sure to reconnect all wiring to the fascia and taillights.
©2016 Cequent™ Performance Products, Inc. -
Printed in Mexico
10. Tighten all M10 fasteners with torque wrench to 38 Lb.-Ft. (52 N*M)
11. Tighten all M8 fasteners with torque wrench to 20 Lb.-Ft. (27 N*M)
Proper torque is needed to keep the hitch secure to the vehicle when towing.
Sheet 7 of 21
24947NP
9-19-16
Rev. B