Kohler K-1679 Guia De Instalacion página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hole 1-1/4"
(3.2 cm)
60" (152.4 cm)
to Floor
Apply silicone sealant.
9. Install the Steam Control
IMPORTANT! Do not locate the control kit directly above the steam outlet.
Make sure that the power is turned off at the main breaker panel before proceeding.
Locate the control kit on the wall 60" (152.4 cm) up from the floor.
At the selected location, drill a 1-1/4" (3.2 cm) hole.
IMPORTANT! Do not pinch, nail, wedge or use undue force on the generator control wire and the control
pad wire. Any damage to these wires may result in control kit failure. If the control kit is not installed
immediately, protect the end connectors of the wires with tape or other shielding material.
Pull the generator control wire through the drilled hole.
Restore the power at the main breaker panel.
Turn on both water and power to the generator.
Test the control unit to ensure it is functioning properly. Refer to the "Operating the Steam Control"
section of this guide to properly test the unit.
Remove the adhesive backing from the back of the control pad.
Apply a continuous bead of silicone sealant around the back edge of the control pad and around the
perimeter of the adhesive area.
Press the control pad firmly onto the wall.
Apply a bead of silicone sealant around the outside edge of the control pad.
Allow the silicone sealant to cure for 24 hours before use.
Kohler Co.
Steam Generator Control Connector
Control Pad
Remove adhesive backing.
Back View
15
Apply silicone sealant.
1045789-2-C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1691K-1692K-1694

Tabla de contenido