A
B
1-1/8"
(29 mm)
A
1-3/4"
(44 mm)
A
K-2974
1/2" NPT
K-2977
3/4" NPT
Install the Valve
Construct the Framing and Install the Rough Plumbing
Determine the desired location for the volume control valve and
construct suitable stud and support framing.
Use the appropriate diameter of copper tubing and fittings
upstream and downstream of the valve.
Prepare the Rough Wall
Provide a 2-7/8" (73 mm) to 3-1/8" (79 mm) diameter hole in the
rough wall material for the plaster guard.
Kohler Co.
3-3/4" (95 mm)
2-7/16" (62 mm)
2-1/8" (54 mm)
C
B
C
3" (76 mm)
4" (102 mm)
3-3/16" (81 mm)
4-1/8" (105 mm)
3
Max
Finished
Wall
Min
Finished
Wall
1205547-2-A