2.9.1. Securing the machine
It is recommended that the machine is secured to the floor at the four points provided using M8 anchor
screws and the corresponding dowels.
Drill holes, observing
the necessary drill depth
A and drill diameter of
the dowel manufacturer

2.10 Completion of Work

Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-04
Clean out the inside of
the holes
Manufacturer ATH-Heinl GmbH & CO.KG
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
- 29 -
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering