Getting Started; Installation Requirements - GE OPAL 2.0 Manual Del Propietário

Ocultar thumbs Ver también para OPAL 2.0:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Getting Started

Installation Requirements

Lifting Hazard: It is recommended to have two people move and install the ice maker in
CAUTION
order to prevent injury.
use your ice maker outdoors.
surface that is able to support the total weight when
full of water.
around the side and back walls of the ice maker for
proper air circulation.
Prepare Opal For Use
missing, please contact
3. Place the ice maker upright on a flat, level surface
and plug it in.
NOTICE
ovens or cooktops.
Opal. The tray slots should align with the front feet of
Opal.
five minutes before first use.
Making Ice
Defrosting
Add Water
Cleaning
Clean
Light
Power
Hold 3 Sec
49-9000029 Rev. 0

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Xpiox3scssXpiox3scbt

Tabla de contenido