KALLISTA P22130 Guia De Instalacion página 9

Griferías de lavabo de orificios separados
Ocultar thumbs Ver también para P22130:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Valve Inlet
Supply Tube
7. Connect the Supplies
Install the water supply shutoff valves according to the
manufacturer's instructions.
Connect the supply tubes to the valve inlets and supply shutoff
valves. Left is HOT and right is COLD.
Tighten all connections.
8. Installation Checkout
Connect the tailpiece and P-trap (not supplied).
Ensure all connections are watertight.
Remove the aerator assembly by turning it counterclockwise.
Open the drain. Open the main water supply and check for leaks.
Repair as necessary.
Open both hot and cold valves and run water through the spout
for one minute to remove debris. Check for leaks in the flexible
hose connections. Turn the valves off.
Install the aerator assembly.
Kallista
Shut-off Valve
9
Spout
Aerator
1008410-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

P22200P22230P22500P22600P22800P22900 ... Mostrar todo

Tabla de contenido