Initial Installation - Harbor Breeze CHESHIRE II Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Bulbs Required (included): 4 candelabra base 60 watt max. bulbs
DANGER:
When using an existing outlet box, make sure the outlet box is securely attached
to the building structure and can support the full weight of the fan. Failure to do this can result in
serious injury or death. The stability of the outlet box is essential in minimizing wobble and noise
in the fan after installation is complete.
CAUTION: Be sure outlet box is properly grounded and that a ground (green or bare) wire is
present.
2. After opening top of carton, remove mounting hardware package from foam inserts. Remove
motor from packing and place on carpet or on foam to avoid damage to finish.
CAUTION: Carefully check all screws, bolts and nuts on fan motor assembly to ensure that
they are secured.

INITIAL INSTALLATION

1. Turn off circuit breakers and wall switch to the fan supply
line leads. (Fig. 1)
DANGER:
Failure to disconnect power supply prior to
installation may result in serious injury or death.
2. Check to make sure blades (H) will be at least 30 in. from
any obstruction and at least 7 ft. above the floor. (Fig. 2)
3. Secure mounting bracket (B) to outlet box
using screws, spring washers, and flat
washers provided with the outlet box. (Fig. 3)
Pull wires from outlet box through center hole
in mounting bracket (B).
*Note: It is very important that you use the
proper hardware when installing the mounting
bracket (B) as this will support the fan.
6
A-15
Fig. 1
Fig. 2
30 in.
min.
7 ft.
min.
Fig. 3
B
H

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Csd52fbz5c4sCsd52bnk5c4s

Tabla de contenido