Installation Of The Curvex3 - Ingeteam NEO Pro Manual De Instalacion Y Uso

Ocultar thumbs Ver también para NEO Pro:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

3.3. Installation of the CURVEx3

1.
Select the circuit on which you wish to install the CURVEx3.
At the meter output
PANEL
Home power
ENERGY
METER
METER
Contracted
power
Electric
vehicle
PANEL
power
2.
Install the CURVEx3 and the smart gateway next to each other, keeping the elements of each device that
allow infrared communication between them in contact.
CAUTION
The three-phase energy meter is designed to be installed on a DIN rail (DIN EN 60715).
3.
Strip the power cables 10 mm and the neutral cable 8 mm.
4.
Put the contacts of the power and neutral cables in the CURVEx3 and tighten the screws.
CAUTION
The incorrect or incomplete connection of voltage or other terminals can cause the device to malfunction or be
damaged.
ABV2012IQM01_ - Installation and Operation Manual
In the home circuit
ENERGY
PANEL
METER
Home power
METER
Contracted
power
Electric
vehicle
PANEL
power
L1, L2, L3: Phase lines.
N: Neutral
Ingeteam
EN
ES
FR
IT
17

Publicidad

Tabla de contenido
loading

Tabla de contenido