Installation
NEO Pro (single-phase)
3.4. Connection of the charger to another charger or a
communications element
NEO Pro models have two local network sockets that, as well as allowing the connection of a three-phase energy
meter (see
"Installation of the
•
Connect the charger to communications equipment (modem, router, switch, etc.).
CAUTION
The equipment can be connected to either of the two sockets on the charger interchangeably.
ABV2012IQM01_ - Installation and Operation Manual
CURVEx3"), also allow the following connections:
NEO Pro (three-phase)
Ingeteam
EN
ES
FR
IT
19