Install Hood Onto Wall - Monogram ZVW1360 Instrucciones De Instalación

Campana de pared de 36” y 48”
Ocultar thumbs Ver también para ZVW1360:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3

INSTALL HOOD ONTO WALL

• Pull house wiring through knockout at the back or
top of the hood.
• Lift the hood and place over the hooks on the
installation bar. Allow the hood to slide down into
position.
• Check to be sure the hood is level and centered.
• Tighten wall anchor screws (C) to finish hood body
installation to the wall.
• Remove cover from junction box inside the hood.
24" minimum over electric
range or cooktop, or 30"
minimum over gas range
or cooktop, and 36"
recommended maximum.
12
Installation
Centerline of
Installation Space
4 (Alternate Mounting Method)
INSTALL HOOD TO SOFFIT
SKIP THIS STEP IF USING WALL MOUNTING
METHOD
IMPORTANT: Soffit framing must be capable of
supporting 100 lbs for 36" models and 150 lbs for
48"models.
When necessary the hood may be installed so that it
is supported by the soffit.
• The soffit should be constructed with 2"x4"s.
• Use a level to draw the cooktop or range center line.
• Continue the centerline forward on the bottom of the
soffit.
• Install horizontal wood supports between the 2"x4",
at distance A to the left and right, as per the table
below.
B
A
C
"A"
"B"
Centerline
Opening for
to Center
Ductwork for
Stud
top venting
36" Models
11-3/8"
10-5/8"H x
11-1/4"W
48" Models
17-3/8"
A
"C"
Opening for
Ductwork for
back venting
10-1/2" H x
13-1/4" W
31-2000734 Rev. 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zvw1480

Tabla de contenido