Finishing The Motor Installation - Kichler Bead 54 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAKE THE ELECTRICAL CONNECTIONS
Step 4. If your outlet box has a ground wire (green or bare copper) connect
Step 4.
If your outlet box has a ground wire (green or bare copper) connect
it to the fan ground wires : otherwise connect the fan ground wire to the
it to the fan ground wires : otherwise connect the fan ground wire to the
mounting bracket. Secure the wire connection with a plastic nut provided.
mounting bracket. Secure the wire connection with a plastic nut provided.
After connecting the wires, spread them apart so that the green and white
After connecting the wires, spread them apart so that the green and white
wires are on one side of the outlet box and black and blue wires are on the
wires are on one side of the outlet box and black and blue wires are on the
other side.
other side.
NOTE: Carefully tuck the wire connections up into the outlet box.
NOTE:
Carefully tuck the wire connections up into the outlet box.
NOTE:
NOTE: Fan must be installed at a maximum distance of 30 feet from the
Fan must be installed at a maximum distance of 30 feet from the
transmitting unit for proper signal transmission between the transmitting
transmitting unit for proper signal transmission between the transmitting
unit and the fan's receiving unit.
unit and the fan's receiving unit.

FINISHING THE MOTOR INSTALLATION

Step 1. Remove the motor assembly from the hook of the ceiling mounting
Step 1.
Remove the motor assembly from the hook of the ceiling mounting
bracket and push up the motor assembly until the two screws on the ceiling
bracket and push up the motor assembly until the two screws on the ceiling
mounting bracket are engaged with the slot holes on the canopy of the
mounting bracket are engaged with the slot holes on the canopy of the
motor assembly. Rotate the motor assembly slightly until the two screw
motor assembly. Rotate the motor assembly slightly until the two screw
heads are in the slot holes. Install the two screws previously removed and
heads are in the slot holes. Install the two screws previously removed and
tighten all four screws. (Fig. 11)
tighten all four screws. (Fig. 11)
Step 2.
Step 2. Push the canopy trim ring up until it locks into place at the top of the
Push the canopy trim ring up until it locks into place at the top of the
canopy. (Fig. 12)
canopy. (Fig. 12)
10 | KICHLER.COM
Fig. 11
Canopy Trim Ring
Fig. 12

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido