Allmand 725 Instrucciones De Instalación página 13

Ocultar thumbs Ver también para 725:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

20. Cut off and discard the female spade terminal from
the wire that was connected to the Zettler relay. Strip
off the appropriate amount of wire insulation and install
wire (X, Figure 17) into a 3 pin lever lock (Y, Figure 17,
Ref. 10) from the kit contents.
17
Y
21. From the kit contents, locate and select the black 16
AWG wire (Z, Figure 18, Ref. 2). Cut the black 16
AWG wire in half, and strip the ends of the cut wires.
On each of the cut wires crimp a blue fork terminal
(AA, Figure 18, Ref. 8) on one of the ends.
18
Z
22. Install the fork terminal end of each black wire (BB,
Figure 19a-b) on DC post 1 of 725 light relay 1 and 2.
Then, install the bare wire ends of the two black wires
into the open ports of the 3 port lever lock (CC, Figure
19a-b) that was installed in Step 20.
19a
CC
BB
725 Relay 1
725 Relay 2
X
19b
725 Relay 1
725 Relay
Connection Detail
23. On Zettler light relay 2 disconnect the remaining 16
AA
AWG wire (DD, Figure 20) from the DC power spade.
This wire should be leading from the divider panel of
the component block. On Zettler relay 1 disconnect
the 16 AWG wire from the same spade.
CC
BB
725 Relay 2
en
English
BB
13

Publicidad

Tabla de contenido
loading

Tabla de contenido