Allmand 725 Instrucciones De Instalación página 2

Ocultar thumbs Ver también para 725:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Allmand Parts & Service
If uncertain about any of the information in this instruction,
or if questions or problems arise, contact the Allmand
service department at 1-800-562-1373, or contact through
the Allmand website, www.allmand.com
Models This Instruction Covers
Maxi-Lite II
Mine Spec
Rig Spec
Kit Instructions Description
These kit instructions cover the installation of the 725
relays to replace a damaged Zettler relay along side the
functioning Zettler relay into the component box of the
Maxi-Lite II unit.
Kit Contents
Locate and identify the kit contents using the table below.
Ref
Description
1.
725 light relays
2.
12" black 16 AWG wire
3.
12" yellow 16 AWG wire
4.
60" red 10 AWG wire
5.
60" black 10 AWG wire
6.
60" blue 10 AWG wire
7.
#8 ring terminal
8.
#8 yellow fork terminal
9.
#8 blue fork terminal
10.
#8 x 5/8 hex washer head screw
11.
3 pin lever lock
Before Kit Installation
1. Shut down the unit and allow ample time for engine
and lamps to cool. Refer to operator's manual.
DANGER
Electrocution Hazard
Attempting to install the kit without first shutting down
the unit will result in death or serious injury. Shut down
the unit before installing the kit.
WARNING
Burn Hazard
Contact with hot surfaces of the engine and lamps
could result in death or serious injury. Always keep
clear of the engine, lamps and other hot areas of the
light tower.
2
2. Disconnect the battery, black negative (-) cable first,
followed by red positive (+) cable. Refer to operator's
manual.
DANGER
Electrocution Hazard
Attempting to install the kit without disconnecting the
battery will result in death or serious injury. Disconnect
the battery before installing the kit.
3. Identify the number of lights and the damaged Zettler
relay number on the Maxi-Lite II trailer model, and
choose the section that corresponds with the identified
Zettler relay for service kit instructions.
Kit Installation: 4-Light Replacement
725 Relay for Zettler Relay 1 or 2
1. Locate and remove the rear door panel (A, Figure
1) from the unit. Set the door panel, bolts nuts, and
washers aside as they will be re-installed in Step 22.
1
Qty
2
1
1
1
1
1
1
4
4
4
2
2. Remove hardware from the AC front panel (B, Figure
2) of the component box and lay open the panel. Set
the hardware aside as they will be re-installed in Step
21.
2
A
B
www.allmand.com

Publicidad

Tabla de contenido
loading

Tabla de contenido