pump. Models with heat exchangers have a
separate 115-volt cord which must be plugged into a
115-volt outlet.
3. Refer to the wiring diagrams below for correct wiring
information. Always check for proper motor rotation
and reverse leads if required.
4.4 Wiring Diagrams
PEM Manual Valve Models
A conduit box is located on the motor for connecting the
power cord.
230 V, 3-Phase
PED Dump Valve and PES Pressure Switch Models
An electrical enclosure is located on the reservoir for
connecting the power cord.
Connect the power cord to L1, L2, and L3 terminals.
460 V, 3-Phase
575 V, 3-phase
Figure 4
Figure 5
PEF, PER, PEV Electric
Valve Models
An electrical enclosure is
located on the reservoir for
connecting the power cord.
(See Figure 6.)
4.5 Connecting Solenoid
Valve
Pendant
Footswitch
Attach the cord to the
solenoid valve using the
connector as shown. (See
Figure 7.)
4.6 Oil Level Gauge
For shipping purposes, a plug is installed in the fill port on
the top of the reservoir.
1. Remove shipping plug.
2. Install the oil level. (See Figure 8.)
4
or
Motor Cord
Figure 6
Figure 7
1
Figure 8
2