Acson international CE35E Manual De Instalación página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
Fig I
Piping and Drain Hose Installation
Fig J
Steps to open intake grille
1. Unlock the screw attached to block lock grille with screwdriver.
2. Remove block lock grille and unlock grille lock.
3. Please refer to Fig K for reference.
Fig K
Block Lock Grille
All manuals and user guides at all-guides.com
Screw (M4)
1-8
Drain Hose

Publicidad

Tabla de contenido
loading

Tabla de contenido