Replacing Slitting Blades; Routine Maintenance - Uline MINI PAK'R H-1604 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WARNING! Burn Risk: Before opening the covers,
turn power OFF, unplug the power cord and
wait 10 minutes for seal bar to cool.

REPLACING SLITTING BLADES

Replace Blades:
• If film jams frequently.
• After processing 50 film rolls.
• If blade does not cut properly or makes very rough
cuts.
1. Turn power OFF, unplug power cord and wait 10
minutes for seal bar to cool.
2. Open belt cover with a slotted or Phillips screwdriver.
(See Figure 15)
3. Remove blade. (See Figure 16)
4. Replace blade. (See Figure 17)
REPLACING SEAL BELTS
Replace Belts:
• If film jams frequently.
• The film won't advance with drive motor running.
• Machine produces poor seals even after adjusting
the seal temperature.
1. Turn power OFF, unplug power cord and wait 10
minutes for seal bar to cool.
2. Open belt cover with a slotted or Phillips screwdriver.
(See Figure 15)
3. Lift belt release lever to loosen seal belts.
(See Figure 18)
4. Push spring-loaded rollers toward front of machine
to loosen either seal belt. (See Figure 19)
5. Remove and replace seal belt. Replace both seal
belts at the same time.
6. Tighten belts by locking belt release lever in place.
(See Figure 20)
PAGE 6 OF 21
MAINTENANCE

ROUTINE MAINTENANCE

Weekly: Clean the seal belts and drive rollers with warm
water and mild detergent if needed.
Monthly: Check the Mini Pak'r™ for damage. Replace
worn or damaged parts if necessary and/or contact
Uline Customer Service at 1-800-295-5510.
Figure 15
Figure 19
Figure 17
Figure 16
Figure 18
Figure 20
0521 IH-1604

Publicidad

Tabla de contenido
loading

Tabla de contenido