Operation Overview; Connect Power - Uline MINI PAK'R H-1604 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Load film roll* onto the film roll holder. (See below)
2. Guide right side of film onto the air fill nozzle and pull
through the machine. (See below)
3. Upper and lower seal belts and drive rollers
advance the film.
*Works only with Uline Air Cushioning rolls.

CONNECT POWER

1. Plug power cord into the rear of the machine, then
plug cord into a grounded outlet. (See Figure 1)
2. Switch machine power ON (I).
LOAD FILM ROLL
1. Slide film onto film roll holder until it seats firmly –
film feeds from top of roll. (See Figure 2)
THREADING THE FILM
1. Unwind 18" of film.
2. Open the air channel on right side of film roll.
(See Figure 3)
3. Slide the air channel over the end of the air fill tube.
(See Figure 4)
4. Advance film.
• To advance film manually:
Pull film down the air fill tube
and through the sealer.
• To advance film automatically:
Pull film down the air fill tube
until it stops. (See Figure 5)
• Press and hold the START button — film advances
automatically. (See Figure 6)
NOTE: There are two different widths of film rolls.
Refer to Figure A for the 8" wide roll and Figure
B for the 16" wide roll to see what the final result
should look like after loading film.
PAGE 2 OF 21

OPERATION OVERVIEW

4. Air pump injects air through the air fill nozzle and fills
air cushions.
5. Hot sealing bar seals air cushions.
6. Slitting blade cuts right side of film from the air fill
nozzle.
LOADING A FILM ROLL
Figure 1
Figure 3
Figure 5
Figure A
Figure 2
Figure 4
Figure 6
Figure B
0521 IH-1604

Publicidad

Tabla de contenido
loading

Tabla de contenido