Descargar Imprimir esta página

KAESER KCF 25 Instrucciones De Montaje Y De Uso página 14

Ocultar thumbs Ver también para KCF 25:

Publicidad

Installation • Instalación
Installation • Instalação
Allgemeine bauaufsichtliche Zulassung
Z-83.5-13
Deutsches Institut für Bautechnik, Berlin
Deutsches Institut für
Bautechnik, Berlin
Zulassungs-Nummer Z-83.5-13
140
KCF 50
9
135
9
32
140
40
12
Note: Shut off condensate drain outlet
until the oil-water separator has been
installed and is ready to be put into service!
Atención: ¡Mantenga cerrada la salida
del purgador de condensado hasta que
finalice la puesta en marcha!
14
Bottom view
Vista desde abajo
Vue de dessous
Vista do fundo
1
A
10
Important:
d´évacuation du condensat jusqu´à la
fin de l´installation!
Atenção: Mantenha fechada a saída
do purgador de condensação até o final
da colocação em funcionamento!
3
1
1
100
KCF 25
A
2
4
A
A -
100
170
Condamner la conduite
english
The KCF oil-water separator has been
approved for the treatment of compressor
condensates by the Institute of Construc-
tion Engineering, Berlin. In Germany, it is
therefore not necessary to apply for an
operating permit.
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
1. Area of installation
• Sealed floor or spill basin ( > 10 l :
KFC 25, > 19 l : KFC 50) ! It is crucial
to ensure that untreated condensate or
oil cannot get into the sewer system in
the event of damage.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the KFC.
2. Installation
See enclosed assembly drawing!
Floor mounting
Use elongated holes of the 4 mounting
(1) feet. Screws and dowels supplied
with unit.Install the KFC unit true to plumb
line (± 1°).
Wall mounting
Fix mounting brackets (2) perpendi-
cularly on the wall.
Push in KCF 25 with mounting area (3)
and lock home clamp (4).
KCF 50 : mount on mounting brackest
(2), screw lateral support bracktes (5) onto
KCF 50 and install at the wall.
Lay condensate feed line(s) along the
wall with a downward slope. Hoses must
always be fixed in such a manner that they
do not make flapping movements and lead
to injuries and/or damage.
Lay water discharge line with a continu-
ous downward slope to the wastewater
discharge point. Install siphon to avoid
disagreeable smells.
An area of installation must be chosen
where untreated condensate cannot
reach the public sewer system.
KCF 25, 50

Publicidad

loading

Productos relacionados para KAESER KCF 25

Este manual también es adecuado para:

Kcf 50