Descargar Imprimir esta página

Wolf CNK 17-63 Instrucciones De Montaje página 3

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
flow
Fig 1: pipework kit for vertical calorifier
Survey of connection kits with coordination to boiler or calorifier types:
The length of the hose is sufficient for a distance of 80 mm between boiler and calorifier in case of side-by-side arrangement and the following combinations.
Art.-No.
calorifier type
Scope of supply:
• 2 corrugated stainless steel hoses DN25, length 1,5 m, insulated,
with threaded connection1" on both sides
• 1 bend 90° insulated with threaded connection 1" on both sides
• 1 pump UPS 25-60 with 4 m cable, completely wired with plug
• 3 reductions 1½"IG / 1"AG
• 2 double nipples reduced 5/4"AG / 1"AG
• 2 seals EPDM 1 ½" for threaded connections of the pump
• 2 seals AFM 1 ½"
• 6 seals AFM 1"
• 1 corner piece with ventilation and convertible gravity brake
Installation instructions
Pipework kit for vertical calorifier
vertical calorifier
CNK 17 - 63
CHK 22 - 60
20 12 071
20 12 071
SE-2 up to 750 or SEM-1 up to 750
boiler
CNG 10 - 35
FNG 10 – 41
20 12 071
20 12 071
additional advice for the pump:
• pump stage 2 for boilers up to 41kW
• pump stage 3 for boilers up to 63kW
• pump shut-off devices are available as accessories
(2 x Art.-No. 20 12 058)
return
CNG 48
FNG 57
20 12 071
20 12 071
SE-2 up to 500
3

Publicidad

loading

Este manual también es adecuado para:

Chk 22-60Cng 10-35Fng 10-41Cng 48Fng 5720 12 071