Tools And Materials; Before You Begin - Kohler K-11660 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para K-11660:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Hacksaw or
Tubing Cutter

Before You Begin

Observe all local plumbing and building codes.
Turn off the water supplies.
Carefully inspect the fittings for damage before installing.
For new bath installations: Install the drain to the bath and finish
the installation according to your bath's installation guide.
For replacement installations: Remove the wall covering from the
drain end of the bath and remove the existing drain.
The overflow ell and drain ell tubes may need to be cut for
proper fit. Dry fit or measure and cut them to the proper length.
If cutting is needed, remove any burrs from the tubes.
1114757-2-B
Sealant
Plumbers Putty or
Suitable Sealant
Tape
2
Plus:
• Trap
• Emery Paper
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-11677

Tabla de contenido