Tools and Materials
Hacksaw or
Tubing Cutter
Before You Begin
Observe all local plumbing and building codes.
Turn off the water supplies.
Carefully inspect the fittings for damage before installing.
For new bath installations: Install the drain to the bath and finish
the installation according to your bath's installation guide.
For replacement installations: Remove the wall covering from the
drain end of the bath and remove the existing drain.
The overflow ell and drain ell tubes may need to be cut for
proper fit. Dry fit or measure and cut them to the proper length.
If cutting is needed, remove any burrs from the tubes.
1114757-2-B
Sealant
Plumbers Putty or
Suitable Sealant
Tape
2
Plus:
• Trap
• Emery Paper
Kohler Co.