Cequent Performance Products 4484 Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

14. Align the rearward cross member with 5/8" diameter drilled holes.
9
15. Install the 5/8" X 2.50 GR5 carriage bolts through the hitch, shims and cross members. Secure with
lock washers and nuts. Torque nuts to 150 Ft.-Lb.
16. For 6300/630044 and 8339 Installations: Install the (2) U-Bolts through the hitch and from under the
vehicle install large flat washer over the U-Bolt followed by a spring, another large flat washer and
secure with a thin 5/8" jam nut. Repeat for other legs of the U-Bolts. The 5/8" jam nuts are tightened
until 3 threads are visible past the bottom of the jam nut.
17. Torque the 5/8 hex nuts, lock washers, and flat washer that attach the rearward cross member to the
brackets to 150 ft.-lb. (203 N-m).
© 2014, 2015 Cequent Performance Products
Installation Instructions
Gooseneck Mounting Kit
Ford F-150
Sheet 6 of 6
Printed In Mexico
Part Numbers:
4484N
5-12-15
4484
Rev. C

Publicidad

Tabla de contenido
loading

Tabla de contenido