support.dell.com
!
This installation guide provides instructions for trained service technicians installing
one or more Dell PowerApp 100 or 110 or PowerEdge 350 systems in a rack. This
guide includes procedures for the following three rack kits:
•
Two-post center-mount
•
Two-post flush-mount
•
Four-post rack cabinet
One rack kit is required for each system to be installed in the rack.
This procedure provides instructions for installing a Dell system in a two-post open-
frame relay rack, such as those found in telecommunications equipment facilities.
Both 3-inch and 6-inch wide two-post racks are accommodated.
The two-post open-frame relay rack must be properly secured to the floor, to the
ceiling or upper wall, and where applicable, to adjacent racks, using floor and wall
fasteners and bracing specified or approved by the rack manufacturer or by industry
standards. See the two-post open-frame relay rack manufacturer's installation docu-
mentation for precautionary warnings and information before attempting this
installation.
!
"
See "Safety Instructions" at the front of this document for additional safety informa-
tion regarding rack installation.
Rack Installation Guide
1-1