Prepare The Site - Kohler Sterling Spectacle 95337-0 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Prepare the Site

IMPORTANT! To ensure a successful installation, install the bath on a level, finished floor.
IMPORTANT! Make sure that the subfloor offers adequate support for the bath.
Temporarily position the bath and shroud in the installation location.
Verify that the bath drain hole aligns properly with the drain pipe. Adjust the shroud and bath
position if necessary.
Verify that the bath is level. Shim under the support blocks if necessary, and secure the shims to the
blocks.
Without moving the shroud, lift and remove the bath from the shroud.
Trace the interior edge of the shroud on the floor.
1408552-2-A
Trace
the hole.
Support
Block
4
Shroud
Sterling

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling spectacle 95338-0

Tabla de contenido