Tools And Materials; Before You Begin - Kohler K-8220 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Adjustable
Wrench
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and web site are listed on
the back cover. Thanks again for choosing Kohler Company.

Before You Begin

Observe all local plumbing and building codes.
Shut off the water supplies.
Carefully inspect waste and supply tubing for any sign of
damage and replace if necessary.
For new installations, assemble the faucet on the sink before
installing the sink.
Before installation, unpack the new faucet and inspect it for
damage. Return the faucet to the carton until you are ready to
install it.
A one-quarter turn counterclockwise will close the cold valve and
a similar clockwise turn closes the hot valve.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
113031-2-AC
Plumbers
Putty
Tube Cutter
2
Sealant
Tape
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido