Energi Savr Node
Step 3: Load wiring
The ESN QS unit operates at 220-240 V ~. Use the following instructions to wire line voltage loads to the ESN QS unit.
WARNING! Danger of Shock. May result in serious injury or death. DO NOT WIRE WHEN LIVE! Switch off power to all power
feeds via circuit breaker or isolator before wiring or servicing the ESN QS unit.
The ESN QS unit is a pass through device. This means that each switched output needs the Line and Load wires. THERE IS NO
INTERNAL CONNECTION BETWEEN THE CONTROL POWER TO THE UNIT AND THE SWITCHED OUTPUTS.
Pass Through Wiring Example A:
4 Circuits, Multiple Feeds
Distribution
Panel
Line
Line
Line
Line
Neutral
Neutral
Neutral
Neutral
Ground
Ground Bar
Ground
Zone Switching Wiring:
• Two (2) 1,0 mm
to 4,0 mm
2
2
• Strip length: 8,0 mm
• Torque: 0,79 N
m
•
Lutron
4
|
®
QS for 0-10 V / Switching
TM
0-10 V Zones:
(QSNE-4T10-D only)
Zone Switching:
220-240 V~
|
Installation Guide
0-10 V Wiring
(QSNE-4T10-D only)
LOAD
LOAD
LOAD
LOAD
0-10 V Wiring (QSNE-4T10-D only)
• 1,0 mm
• Strip length: 6,0 mm
• Torque: 0,5 N
• 0-10 V zones 1-4 are double-insulated from all
other inputs and outputs.
• 0-10 V zones 1-4 are not insulated from each
other. They share the same common (negative "–"
terminals are internally connected to each other).
• Connect only SELV/PELV circuits, or connect only
non-SELV/PELV circuits to 0-10 V zones 1-4. Do not
mix SELV/PELV circuits and non-SELV/PELV circuits.
• Follow all national and local codes for separation
requirements.