Installation Requirements; Checklist - Dacor DOB30M977 Serie Requisitos De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation requirements

Checklist

Use this checklist to verify that you have completed each step of the installation process.
This can help you avoid mistakes.
1.
Before installing the oven, be sure to verify the cabinet dimensions are correct for
your unit and the required electrical connections are present.
Refer to the installation manual for content regarding Safety, Cabinet Dimensions,
2.
Removing Packaging, Electrical Installation, Testing the Installation and Customer
Service.
To lift up the oven, hang the install handle onto the side hook of the unit.
3.
4.
Move the oven unit into place in front of the cabinet opening, leaving the bottom
packaging on the unit to avoid damaging flooring.
5.
Team lift the unit directly into the cabinet cutout taking care not to pinch fingers or
scratch hands or arms. Make sure the electrical conduit reaches to the connection
point properly.
6.
Slide the unit all the way into place, making sure to route the electrical conduit
correctly.
7.
Fasten the oven unit to the cabinetry opening with screws supplied (using Philips
screwdriver).
Consult the complete installation instructions and follow the remainder of the
8.
procedures listed, including performing an operation test.
9.
All product literature and accessories are supplied (may be wrapped or boxed) with
the oven.
10. INSTALLER - Leave the literature pack and the accessories with the customer.
11. Keep the install handle for possible future use.
8
English
NW9000K_MOD_DOB30M977DS_DG68-00923A-01_EN+MES+CFR.indb 8
10/16/2019 12:50:48 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dob30m977ssModernist dom30m977 serie

Tabla de contenido