Electrical Connections - DITEC DOITOB Manual Para La Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
[15], check it is aligned with the rear bracket and fix it to
GB
the gate.
-
Fix the piston to the front bracket with the pin [G] supplied
(fig.6). To work correctly, the gearmotors must be assem-
bled with the motor casing at the top.
-
Unblock the gearmotor and check (moving the gate ma-
nually) the entire stroke is free of interference. Slightly
lubricate the front and rear articulated joints.
-
Assemble the tube cover [12] with the cap [13], and fix it
with the screw [H] supplied (fig.7).
Pay attention to the insertion direction. The slits on the
closing cap [13] must be on the lower part in order to help
the water to come out.
-
Assemble the casing [10], paying attention to the positio-
ning of the cable.
4.

ELECTRICAL CONNECTIONS

The gearmotor DOIT OB can be connected to the E2H control
panel.
The electrical wiring and the start-up of the gearmotor DOIT
OB are shown in fig.8 and in the installation manual of the E2H
control panel.
5. MAINTENANCE PROGRAM (every 6 months)
Without 230 V~ power supply and batteries if present:
-
Clean and lubricate, using neutral grease, the turning pins,
the hinges of the gate and the drive screw
-
Check that fastening points are properly tightened.
-
Check the electrical wiring is in good condition.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustments.
-
Check the good operation of all command and safety
functions (photocells).
-
Check the good operation of the release.
-
If the E2H control panel is mounted, check for battery
continuity by powering off and performing several
manoeuvres in sequence. Upon test completion, power
back on (230 V~).
ATTENTION: For spare parts, see the spares price list.
DOITOB - IP2015
12

Publicidad

Tabla de contenido
loading

Tabla de contenido