Installation Space; Installation Procedures - Hitachi PC-ARH Manual De Instalación Y Funcionamiento

Ocultar thumbs Ver también para PC-ARH:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
Installation Work
8

2.3. INSTALLATION SPACE

In case of installing the controllers in vertical line, keep a distance more
than 50mm between the controllers vertically.
If the distance is insuffi cient, the controller can not be taken out.

2.4. INSTALLATION PROCEDURES

1. Remove the controller from the holding bracket.
2. Connection of cable:
Connect the accessory cable to the fi elded cable by soldering.
Insulate the connecting part by vinyl tape.
3. According to the installation requirements fi x the Remote control
switch following one of these three options showed bellow:
- Case of exposing Remote Control cable.
- Case of using a Switch box.
- Case of using a Night table.
Installation in case of exposing Remote control cable.
Fix the accessory cable holding bracket onto the wall with 2 -M4
screws (accessory)
Installation in case of using a switch box:
Prepare fi eld-supplied JIS Box (JIS C 8336-1988).
Fix the accessory Holding bracket on the wall with 2-M4 screws
(fi eld supplied)
Field supplied cable
Connection part
Screws
Accessory cable
JIS Box
(JIS C 8336-1988)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pc-arhePc-p5h1e

Tabla de contenido