Instructions For Assembly; List Of Spare Parts - Kettler COACH M Instrucciones De Montaje

Ocultar thumbs Ver también para COACH M:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
GB Assembly Instructions
The crosstrainer has a magnetic brake system.
To operate correctly, the pulse function requires a minimum vol-
tage of 2,7 volts (only for computers working with batteries).

Instructions for Assembly

Ensure that you have received all the parts required (see check
list) and that they are undamaged. Should you have any cause
for complaint, please contact your KETTLER dealer.
Before assembling the equipment, study the drawings carefully
and carry out the operations in the order shown by the diagrams.
The correct sequence is given in capital letters.
Please note that there is always a danger of injury when working
with tools or doing manual work. Therefore please be careful
when assembling this machine.
Ensure that your working area is free of possible sources of dan-
ger, for example don't leave any tools lying around. Always dis-
pose packaging material in such a way that it may not cause
any danger. There is always a risk of suffocation if children play
with plastic bags!
The equipment must be assembled with due care by an adult
List of spare parts page 35-37
When ordering spare parts, always state the full article number,
spare-partnumber, the quantity required and the S/N of the product
(see handling).
Example order: Art. no. 07974-100 / spare-part no. 94317667
/ 2 pieces / S/N .................... Please keep original packaging
of this article, so that it may be used for transport at a later date,
if necessary.
Goods may only be returned after prior arrangement and in (in-
ternal) packaging, which is safe for transportation, in the original
box if possible. It is important to provide a detailed defect des-
cription / damage report!
Important: spare part prices do not include fastening material; if fa-
stening material (bolts, nuts, washers etc.) is required, this should
be clearly stated on the order by adding the words „with fastening
material".
All manuals and user guides at all-guides.com
Before beginning your first training session, familiarize yourself
thoroughly with all the functions and settings of the unit.
person. If in doubt call upon the help of a second person, if pos-
sible technically talented.
The fastening material required for each assembly step is shown
in the diagram inset. Use the fastening material exactly as in-
structed. The required tools are supplied with the equipment.
Bolt all the parts together loosely at first, and check that they
have been assembled correctly. Tighten the locknuts by hand until
resistance is felt, then use spanner to finally tighten nuts com-
pletely against resistance (locking device). Then check that all
screw connections have been tightened firmly. Attention: once
locknuts have been unscrewed they no longer function correctly
(the locking device is destroyed), and must be replaced.
For technical reasons, we reserve the right to carry out prelimi-
nary assembly work (e.g. addition of tubing plugs).
Waste Disposal
KETTLER products are recyclable. At the end of its useful life please
dispose of this article correctly and safely (local refuse sites).
GB
KETTLER GB Ltd.
Kettler House, Merse Road
North Moons Moat
Redditch, Worcestershire B98 9HL
+44 1527 591901
www.kettler.co.uk
USA
KETTLER International Inc.
1355 London Bridge Road
Virginia Beach, VA 23453
www.kettlerusa.com
+44 1527 62423
Mail: sales@kettler.co.uk
+1 888 253 8853
+1 888 222 9333
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

07974-10007974-190

Tabla de contenido