Operation; Setting Up The Welding Machine - geberit UNIVERSAL Manual De Operación

Ocultar thumbs Ver también para UNIVERSAL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
EN

Operation

Setting up the welding machine

Prerequisite
– All the required accessories and additional
devices, including tension devices, supports,
planes, welding plates, etc., must be present
ready for commissioning.
1
Place the hand-operated plane or electric
plane and the welding plate support
between the clamping carriage and the
tensioning block. Push the guide bar through
the plane and the welding plate support and
fix it in place.
2
Mount the welding plate on the welding plate
support.
24
3
Place the tension devices on the protruding
dovetail heads of the clamping screws.
4
Align the tension devices and clamp with the
eccentric levers.
Pipe support prisms d50–160 must be used
for pipes and fittings d50–160 mm. Pipe
support prisms d200 or supports d200–315
must be used for pipes and fittings d200–
315 mm.
The swivel support with base serves as a
support for pipe bends or branch fittings.
18014405647374603-1 © 10-2020
996.254.00.0(07)

Publicidad

Tabla de contenido
loading

Tabla de contenido