Starting The Machine For The First Time; Connecting To The Water Supply; Electrical Connection And First Use - La Pavoni LPSGEV02 Manual De Uso

Ocultar thumbs Ver también para LPSGEV02:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
27. PID temperature controller*
*Standard only on some models
4. STARTING THE MACHINE FOR
THE FIRST TIME
4–1. CONNECTING TO THE WATER
SUPPLY
• LPSGEV01 - LPSCOV01- LPSGEV02
machines can either be used with a
water tank (2) or connected to the
mains water supply using the hose
provided (17).
• In order to use the machine with a
water tank (2), the switch (C) has to be
in position "I" (this should be done with
the machine switched off) (Fig. 1-2).
To use the machine connected to the
water supply:
• Place the switch (C) to position "II"
(this should be done with the machine
switched off) (Fig. 1-2).
• Connect the hose (17) to the fitting
(DX) located under the machine and
then connect it to the water supply
(Fig. 1).
• It is recommended that you
install a water softener on the
machine water supply system.
• Make sure that the water in
the water supply that you will
be connecting the machine to is
potable.
• This appliance should be
connected to the water supply
in compliance with the national
Legislation of the country in which
it is used.
• The maximum inlet pressure
to the machine from the water
supply must not exceed 0.65 MPa.
• If the mains water pressure is
higher than 0.5 MPa (5 bar), it is
recommended that you install a
balanced pressure regulator for
high pressures.
4–2. ELECTRICAL CONNECTION AND
FIRST USE
• To start the espresso coffee machine,
carefully follow the instructions below:
• Open the package, take out the
machine and make sure that it is not
damaged.
• Place the machine on a level surface,
remove the cover, take out the water
tank (2) and rinse it.
• Fill the tank with clean water, put it
back in its seat, and insert the silicone
tubes. Close the machine cover.
• If you connect the machine to the
water supply, make sure that the water
supply tap is open before switching on
the machine.
• Water can be drained directly into
a drainage outlet by removing the
plug (A) from the drip tray (13) and
connecting the silicon tube (25) to the
tray (B) (Fig. 1).
Before connecting the machine,
make sure that the mains power
voltage is the same as the one
indicated on the data plate
located under the base of the
machine.
• Insert the plug into the power socket.
• Turn on the machine by placing the
on / off switch (1) to position "I". Wait
for approximately 2 seconds to allow
the circuit to perform a check. The
lamp (14) lights up to indicate that the
machine is powered.
• The automatic water level device
will start filling the boiler with water
until it reaches the pre-set level; the
level of water in the boiler is checked
automatically and will be topped up
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lpsgev01Lpsgim01Lpscov01Lpscem01Lpsccc01

Tabla de contenido