Installation; Before The Installation; Panels Opening - ELICA SUT950 Guía De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BEFORE THE INSTALLATION

This models can be used only if connec­ted with
external
motors
produced
manufacturer.

PANELS OPENING

It is possible to open the steel panels, which
cover the grease filters, by slightly pulling on
a side of the panel itself, as shown in Fig. 1.
To achieve the complete opening of panels, you
need to release the safety chains, by using the
appropriate spring catches.
For proper working, it is recommended to install
the appliance at a distance of 2000
< 2100 mm from the floor.
Before starting the appliance installation,
please
check
that
all
damaged, in such a case contact your retailer
and do not carry out installation.

INSTALLATION

Fit a false ceiling with an opening that has the
following dimensions:
SUT950: 1465x965 mm with a minimum
distance of 330 mm between the ceiling and the
false ceiling;
SUT951: 1065x665 mm with a minimum
8
All manuals and user guides at all-guides.com
INSTALLATION
distance of 330 mm between the ceiling and the
false ceiling.
by
the
same
After having chosen the most suitable po­sition,
prepare the ducting: an air outlet connection
piece, with a diameter of 150 mm to be installed
in
appliance.
Leave
shown in fig.2.
Draw
ceiling<mounted hood
shown in Fig. 3 according to the model chosen.
components
are
not
Make 4 holes in the ceiling according to the
dimensions as shown in Fig. 4, place the metric
plugs provided in the holes.
the
side
selected,
is
any
unused
exhaust
the
outline
of
the
on
the solid ceiling as
provided
with
the
outlets
closed.
As
hole
to
house
the

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sut 951

Tabla de contenido