en
English
Installation and commissioning heating controller
en
Do not throw these instructions away but keep them with the controller!
Installation
Place of installation
•
In a dry room, e.g. the boiler room
•
Mounting choices:
– In a control panel (on the inner wall or on a top hat rail)
– On a panel
– In the control panel front
– In the sloping front of a control desk
•
Permissible ambient temperature: 0...50 °C
Electrical installation
•
Local regulations for electrical installations must be complied with
•
Only qualified staff may carry out electrical installations.
•
Cable strain relief must be provided
•
Cables from the controller to the actuator and the pump carry mains voltage
•
Cables to the sensors should not be run parallel to mains carrying cable (e.g. power supply
for the pump) (insulation class II to EN 60730!)
•
If a device is defective or damaged, immediately disconnect it from power and replace it.
Permissible cable lengths
•
For all sensors, thermostats and external contacts:
Copper cable 0.6 mm dia.
Copper cable 1.0 mm
Copper cable 1.5 mm
•
For the room units:
Copper cable 0.25 mm
Copper cable 0.5 mm
Building Technologies
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818
max. 20 m
2
max. 80 m
2
max. 120 m
2
max. 25 m
2
max. 50 m
74 319 0619 0 a
17.04.2008
34/288