English
2
Commissionning
See also:
- Technical instructions for the boiler
- Domestic hot water calorifier instructions
- Control panel instructions
- Burner instructions
Fill, bleed and check the watertightness of the primary circuit in
accordance with the boiler's assembly instructions:
Open the manual bleed valve.
Turn the anti-thermosiphon valve to open (O).
Fill the low flow heating circuit using the drainage tap in order to
favor the bleed.
After filling the installation, close the drainage tap.
Close the manual bleeder valve when water flows out.
Turn the anti-thermosiphon valve to automatic (A).
During the heating process, a certain amount of water may
flow through the valve or safety unit; this is caused by
water expansion. This phenomenon is completely normal
and must in no event be hindered.
Bleed the installation again after it has been in operation
for some time.
14
Nederlands
2
Inbedrijfname
Zie ook:
- Technische handleiding van de ketel
- Handleiding van het sanitair-warmwatertoestel
- Handleiding van het bedieningspaneel
- Handleiding van de brander
Vullen, ontluchten en de waterdichtheid van de primaire kring
controleren
volgens
verwarmingsketel:
Open de handbediende ontluchter.
Zet de antithermosifonklep open (O).
Vul de verwarmingskring langzaam via de aftapkraan om de
ontluchting te bevorderen.
Als de installatie eenmaal gevuld is, de aftapkraan opnieuw dicht
draaien.
Sluit de handbediende ontluchter wanneer het water
wegstroomt.
Zet de antithermosifonklep in de automatische stand (A).
Tijdens het opwarmen van het sanitair warm water kan er
via de veiligheidsklep of via het veiligheidsaggregaat een
bepaalde hoeveelheid water wegstromen ten gevolge van
de uitzetting van het water in het reservoir. U hoeft zich
over dit heel normaal verschijnsel, dat in geen geval
verhinderd mag worden, geen zorgen te maken.
Ontlucht de installatie opnieuw nadat deze enige tijd
gewerkt heeft.
EA 120
de
montagehandleiding
11/04/07 - 300011336-001-C
van
de