Operator
4145M
Green and yellow
wire (ground wire)
0590D
S-7100A
1. INSTALLATION
<For 100V/400V system specifications>
(1) Power switch
(2) Screws [2 pcs]
(3) Transformer box
(4) Transformer box plates [2 pcs]
(5) Screw [with washer]
(6) 3-pin power supply connector
(7) Staples [5 pcs]
(8) Cord clamps [2 pcs]
(9) Power cord
1. Attach an appropriate plug to the
power cord (9). (The green and
yellow wire is the ground wire.)
2. Insert
the
power
properly-grounded electrical outlet.
[NOTE]
・ Take care when tapping in the
staples (7) to make sure that they do
not pierce the cords.
・ Do
not
use
extension
otherwise
machine
problems may result.
plug
into
a
cords,
operation
10